Vertical driving-in of a pipe in diameter 820mm for a mooring post on whole length 18m. The engineering challenge of the given project consisted in soil of 5 class. Nevertheless, the first three meters of the pipe had been driven in only for 2 hours. The whole process was longer than ussually, because of the construction accuracy that is needed as well as the necessity to perform specific requirements of the Marine port Authority.